Skip to product information
Vesgantti Hybrid Mattress
$444.00
Details

SPECIFICATIONS

Brand Name: Vesgantti

CN: Guangdong

General Use: Home Furniture

Hign-concerned Chemical: None

Installation Method: Self-Contained

Model Number: JJC0229BAF

Origin: Mainland China

Thickness: 10"

Type: Bedroom Furniture

【Hybrid Construction Enhances Comfort】: Indulge in the ultimate sleep experience with the Vesgantti mattress, which combines comfort foam and individually pocketed springs. This king mattress caters to your every need, offering the perfect blend of support and plush comfort.

【Peaceful Night Without Disturbance】: Pocket coils move independently, absorbing movement and preventing it from spreading across the mattress. This colchones ensures you and your partner can rest peacefully without interruption.

【Optimal Support and Comfort】: The Vesgantti mattresses utilize independently wrapped pocket coils for targeted support. The foam comfort layer conforms to your body, relieving pressure on shoulders and hips while promoting proper spinal alignment.

【Breathable & Long-Lasting Freshness】: Designed with a breathable fabric cover, the mattress king size 10/12 inch enhances airflow to keep you cool and comfortable. Its moisture-wicking and odor-absorbing properties ensure a clean and refreshing sleep environment.

【King Mattress in a Box】: The Vesgantti mattress in a box is vacuum-compressed and conveniently packaged, making it easy to transport into your home. Allow the king bed mattress to fully expand for 72 hours before enjoying your journey to quality sleep.













Materials + Care

We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.

Shipping + Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

You might also like...